PermitSetReady › Permit drawings in Brampton

Brampton · for designers, contractors & engineers

Permit drawings in Brampton, drafted for your firm.

Second and third units, below-grade entrances, decks, garages and sheds in Brampton, drawn in your title block and checked against both Brampton zoning by-laws for the address. You review, stamp and submit through the Brampton Building and Business Portal.

One price list, Brampton included.

CAD, before tax, 4–7 business days. Rush (3 business days) +30%. Drafted to the 2024 Ontario Building Code, in your title block or our clean format.

Drafting & permit drawing set

  • Basement finish$1,050
  • Second unit (ARU)$1,400
  • Below-grade entrance$850
  • Detached garage$850
  • Deck$750
  • Shed, cabana, gazebo or pergola
    15 m² or less with no plumbing: build drawings, $350
    $750
  • Basement lowering (underpinning or benching)
    $400 added to a basement finish or second unit
    $650
  • Additions, new homes, general drafting$85/hr or quoted
Book a job

What you get back

  • PDF set and DWG files✓
  • Your title block, or our unbranded one✓
  • Watermarked draft to check and mark up✓
  • Job notes: assumptions and Code / zoning flags✓
  • Code revisions from City comments✓
  • Our name nowhere on your drawings✓

You stay the designer or engineer of record: you review, stamp or seal, and submit.

Brampton rules we draw to.

Checked against Zoning By-laws 270-2004 and 14-2026 and the City's own pages, as of October 2026. By-laws change often: confirm with the City before you submit.

Two by-laws apply

The new Comprehensive Zoning By-law 14-2026 is under appeal, so both it and By-law 270-2004 apply. We check the set against both and draw to the more restrictive requirement.

Up to three units

The principal dwelling plus an attached second unit and a garden suite, or plus two attached units.

Parking

No extra space for one additional unit; one extra space, tandem permitted, for two.

Entrance and size

The second unit must be smaller than the principal unit. Its entrance can be in the side or rear yard with a 1.2 m unobstructed path to the principal entrance.

Below-grade entrances

Filed with the Schedule B Below Grade Entrance Declaration; the location is confirmed against zoning for the address.

Sheds

Rear yard only, 0.6 m from all lot lines, 3 m high, no more than two structures and 20 m² combined (15 m² each). A permit is needed at 15 m² or more.

Decks

A permit is needed if the deck is attached to the house or 0.6 m or more above the ground.

Registration and conservation areas

Second units must be registered, which completes at final occupancy. Lots in CVC or TRCA regulated areas need conservation authority approval.

Submitting in Brampton. Brampton's two-unit package requires a legible legal survey and a fully dimensioned site plan at a minimum scale of 3/16" = 1'-0", plus existing and proposed floor layouts, elevations showing the entrance and egress windows, and fire separation details.

Questions from Brampton firms

Do I need a survey for a Brampton second unit?

Yes. Brampton lists a legal survey as mandatory for second-unit applications. Send it with the job and we build the site plan from it.

Will my client or the City see your name?

No. The set goes out in your title block, under your name. We never contact your client or the municipality.

Can you guarantee zoning approval?

No. We check the set against the zoning by-law for the address and flag anything tight on the job notes sheet, but approval rests with the municipality. By-laws change often, so confirm the current rules with the City before you submit.

Have a Brampton job on your desk?

Send the sketch or markups, the survey and your deadline. Your price or quote comes back within one business day.

Book a job

Also drawing in Mississauga · Toronto · Oakville, and across Ontario under Part 9.